OMP-AMIS TECHNICAL DOCUMENTATION: CONFIDENTIAL |
PT Agrisoft-Systems Indonesia |
Jadwal Training OMP
Day 01: 29 July 2008
Training schedule:
8:00-10:00 Introducing OMP.
10:15-12:00 Installation & set-up (estate level).
OMP / OMP GIS installation.
Relinking OMP/refresh GIS.
Linked table manager.
Hands on - View block, DA, Reports, GIS Map, Basic navigation, Access keys.
Constant values - agronomy, system administration.
Pick up list settings - All data entry requirement.
GIS settings.
Password maintenance.
13:00-14:00 DE principles and data collation / System parameter
14:00-16:00 Enter basic block data.
New block entry.
Data collection form – New block data.
Block entry (3 divisions x 10 blocks).
Data review (Size and other block specific parameter).
Prepare next year (4 years).
Prepare first year (1 year).
Delete last year.
Delete first year.
Prepare new development (1 division x 5 block).
Append next year.
Filter form.
Data analysis – Yield/General Production/Printing.
All DA
Filter use to generate report
16:00-16:30 Q&A
Day 02 – 30 July 2008
Training schedule:
8:00-9:00 DE yield and production calculations
Using Filter settings, data evaluation9:15-12:00 DE yield, harvesting, tree census, Data evaluation
Data collection form.– Yield data.
Block entry - Yield.
Tab stop settings. Combo goto.
Monthly entry.
On screen filter/sort/Data evaluation.
Block entry – Palm census.
Red text box update in block entry form.
Assign new criteria in pick up list.
Update criteria in block entry form.
Calculation method - Yield.
Data analysis – Yield.
Yield and Block performance.
Harvesting round length.
Harvester productivity.
Yield statistic.
GIS yield.
13:00-14:00 DE fertilizer, CR, nutrients, GIS.
14:00-16:00 Enter fertilizer and CR data.
System settings - Fertilizer type.
System settings - Constant values – Fertilizer application method.
Pick up list settings - Introduction to soil type, yield potential and yield distribution.
Fertilizer entry.
Recommendation and application entry – single block.
Nutrient calculation.
Copy recommendation.
Reconcilliation.
Block entry – Nutrients.
Data analysis.
Nutrients.
Fertilizer application and requirement.
GIS fertilizer.
Add-ins Pesticide – Define Active ingridients, define produk, select calculation unit.
Add-ins Pesticide – Entry.
Add-ins Pesticide - Data analysis.
Pesticides and Active ingridients.
GIS pesticide.
16:00-16:30 Present results.
All participants prepare 5 reports.
Day 03 – 31 July 2008
Training schedule:
8:00-9:00 DE Field Upkeep, YGA, BMP, DA Field upkeep.
9:15-12:00 DE yearly data.Data evaluation, update methods .
Topic:
Fertilizer entry continue
13:00-14:00 DE Add-in Intro.
14:00-16:00 Enter and use add-in data.
Topic: Block entry – Field upkeep.
Environment/P&D.
Veg. Growth/Management.
Leaf analysis.
Soil analysis.
Data analysis – Field upkeep.
Environment/P&D.
Veg. Growth/Management.
Leaf analysis.
Soil analysis.
Rainfall entry.
Block entry form.
Rainfall entry form.
Data analysis – Rainfall.
Data analysis – Yield gap.
Data analysis – BMP.
16:00-16:30 Present results.
Day 04 – 01 August 2008
Training schedule:
8:00-10:00 Training resume
10:15-12:00 Advanced system settings, db maintenance.
Topic: Add-ins Crop budget.
Data entry.
Prepare conversion rate.
Prepare new budget.
Budget entry.
Copy monthly distribution.
Data analysis.
Add-in Crop Forecast.
Data entry.
Block assignment.
BBC count entry.
Data analysis and reporting.
Add-in field upkeep.
Define scores.
Data collection form – Inspection.
Inspection entry.
Data analysis.
Add-in – Crop loss audit.
Data entry.
Data analysis/report.
13:00-14:00 Q&A.
14:00-16:00 OMP enterprise, OMP group.
Topic:
OMP add-ins block maintenance.
Rename/combine division.
Split division/move block.
Assign block to field.
Assign block to LSU.
Rename/Combine/Split/Delete block.
Split/Combine database.
Importing data from excel sheet
Upgrade OMP.
OMP Enterprise, setup VPN
OMP Group licence,Headquarter setup.
16:00-16:30 Closing training
| Page 1 of 5 |